Quantitative Aptitude Quiz 140 for IBPS PO

Direction (Q. 1-5) : Study the table carefully to answer the questions that follow :
Number of people (in thousands) staying in 6 different cities and the % of Men, Women and Children in those cities :

image

1. What is the respective ratio of number of Men from city D to number of Women from city E ?
1)  7203 : 1479 2) 27 : 37 3) 8908 : 4131 4) 91 : 79 5) None of these

2. Which city has the lowest number of Men ?
1) A 2) E 3) B 4) C 5) None of these

3. Total number of people from city C is approximately what percent of the total number of people all cities together ?
1) 19 2) 23 3) 26 4) 14 5) None of these

4. Number of Children from city F is what percent of those from city B ? (Rounded off to two digits after decimal)
1) 109.92 2) 111.47 3) 98.52 4) 132.71 5) 93.47

5. What is the average number of Men from all the cities together ?

image

6. Three equal cubes are placed adjacently in a row. Find the ratio of total surface area of the new cuboid to that of the sum of the surface areas of the three cubes ?
1)  1 : 3 2)  7 : 9 3)  3 : 7 4)  2 : 3 5) None of these

7. The outer circumference of a circular track is 220 m. The track is 7 m wide everywhere. Calculate the cost of levelling the track at the rate of 50 paisa/square meter ?
1)  `1925 2)  `1293 3)  `673 4)  `793 5) None of these

8. Ram's project report consists of 25 pages each of 60 lines with 75 characters on each line. In case the number of lines is reduced to 55 but the number of character is increased to 90 per lines. What is the percentage change in the number of pages? (Assume the number of pages to be a whole number.)
1) –12 % 2) – 8% 3) + 12% 4) + 8 % 5) None of these

9. A, B, C enter into a partnership with share in the ratio 7/2 : 4/3 : 6/5 After 4 months, A increases his share by 50%. If the total profit at the end of one year be `43200, then C's share in the profit is –––
1)  `4200 2)  `3686 3)  `7200 4)  `8640 5) None of these

10. A can do a piece of work in 16 days. He works at it for 4 days and then B finishes it in 10 more days. In how many days will A and B together finish the work ?

image

Answers :-

image

image

image

Advertisements

0 comments:

Post a Comment

Register Here To Get Daily Bank Jobs Updates In Your Email Inbox

Enter Your E-Mail ID:

Don't Forget to Activate the Email Subscription from your Inbox